Industrial Projects Project 2

Stetpak with dissolved air floatation (DAF) second stage treatment.

Equipment was installed by Falmouth Oil Services who receive ships bilge water, slops and also oil water from road tankers.

The free oils are removed in the Stetpak and the emulsified oils are removed in the DAF unit.

The final effluent is designed to be sufficiently low to achieve a substantial reduction in discharge costs.

Estimated payback period of 18 months.

 

Oily Water Reception and Treatment Facility for Ships Bilges and Slops. Falmouth Oil Services, Falmouth Docks.

Stetpak Separator for Free Oil removal.

Dissolved Air Floatation for Emulsified Oil Removal>

Design Flow : 20 m3/hr. @ max 10,000 mg/l COD>

Design Effluent : < 1000 mg/l COD.

  Stetpak with Disolved Air Flotation (DAF)

© Victor Marine Ltd.

 

Designed and hosted by Connexions Web Solutions